
The technical report from the municipal architect and the technical architect indicates that «given the threat of imminent ruin and therefore a danger to public safety, the immediate and urgent adoption of the following precautionary measures is proposed:
– Evacuation of homes and premises in the block, consisting of staircases 1, 3, 5, and 7 on Palombar Street.
– Cutting off of supplies.
– Sealing or fencing off the sidewalk in front of the building, establishing a protection perimeter.
– Conducting surveys on the ground floor of the building, specifically in the areas of load-bearing walls facing the courtyards and the areas of the footings of the pillars.
– Inspection of the entire building’s sanitation system using cameras to detect breaks and blockages.
– Repair of the general collector system for each staircase to channel rainwater and wastewater to the main sewer.
– Underpinning of load-bearing walls and pillars if the soil tests determine the need.»
«These measures will be implemented immediately and under the supervision of the competent technician, without prejudice to the adoption of new measures based on the results of the soil tests.» Please rewrite this sentence.
FUENTE